polyvion

CIN : U74996DL2006PTC153531

QUALITY SETUP

Our Company believes in “Total Quality Assurance” in manufacturing & Services to meet the consumers needs and expectations. Continuous dedication to ensure compliance to quality systems & technical specifications.

pic-1
pic-2
QUALITY ASSURANCE IN PLANNING

Customer requirements and specifications are taken into quality planning with due care in designing, manufacturing, testing & performance aspects.

QA IN RAW MATERIAL

The raw materials are procured from the best of sources based on company’s stringent vendor evaluation system with continuous periodic assessment & testing.

QA IN IN-PROCESS MANUFACTURING

The company has stringent in-process quality control for all its critical processes.

FINAL TESTING

Each consignment of cables is exhaustively tested before dispatch clearance by highly qualified, experienced dedicated testing team.

The testing setup is broadly classified as follows:

  • Raw Material Testing
  • Type Testing
  • FR/ FS/ FRLS Testing
  • Long Duration Testing

All the laboratories are equipped with the modern testing instruments. All the instruments are regularly calibrated.

TESTING EQUIPMENT

FOR FR/ FRLS/ ZERO HALOGEN/ FS CABLES
  • Oxygen/ temperature index-test apparatus-as per ASTM D-2863
  • HCL gas generation test apparatus-as per IEC 754-1
  • Smoke density test apparatus-as per ASTM D-2843
  • Swedish chimney test apparatus-as per ss-424: 1475
  • Flammability test apparatus-as per IEC-332 part 1 & 3
  • Circuit integrity test/ fire survival test as per IEC-331
FOR LT POWER/ CONTROL/ INSTRUMENTATION AND OTHER CABLES
  • All test facilities available as IS-1554 Part I, IS-7098 Part I, IS-694.
pic-3